293kW Commercial Solar

HPS Transport

Scenario

This site has a high demand during business hours and a high base load, which means it is well suited to a large solar installation.

Proposal

The system was designed to meet the site’s load with little export. Through winter months the site utilises approximately 95% of its generated solar, and in summer months it exports slightly more.

  • 293kW Solar

The Results

Get a reliable quote from specialists who speak your language